- ACCIONA
- Projects
- Energy
- Wind Power
- Punta Palmeras Wind Farm
45-MW wind farm, equipped with 15 AW116/3000 ACCIONA wind turbines of 3 MW of nominal power, mounted on steel towers with a hub height of 92 m, capable of supplying clean energy to more than 60.000 Chilean homes. Operational since 2014.
Mt Gellibrand Wind Farm is located 25 kilometres east of Colac and 17km west of Winchelsea in the Colac Otway Shire on Victoria’s Western Plains. The wind farm has been constructed around the southern and western sides of Mt Gellibrand itself. These open and partly elevated plains make the site an ideal location for a wind farm.
The site covers an area of about 29km², with a coastal exposure of nearly 11 kilometres. The Wind Farm consists of 33 two-megawatt wind turbines – generating enough green electricity to supply 35,000 homes every year.
View ACCIONA Social Networks