Krobia I Wind Farm

First commercial wind farm with AW3000 wind turbines on towers with hub heights of 120 metres.

The Krobia I Wind Farm is made up of 11 AW3000 wind turbines with ACCIONA technology and 3 MW nominal capacity, for a total power of 33 MW. Connected to the grid in 2013 and operated by ACCIONA, it was the first commercial wind farm installed by the company using concrete towers and hubs heights of 120 m, making it possible to better harness the wind potential of the location.

GENERAL INFORMATION

Location
Krobia, Greater Poland, Poland
Power
33 MW
Wind turbine
ACCIONA Windpower AW116/3000
Tower
Concrete, hub height: 120 m
Commissioning
2013
Ownership
ACCIONA

Highlights

     
  • Foundations and installation of 11 wind turbines.
  • 9 km of access roads.
  • 19 km of underground medium-voltage collection grid.
  • 110/30/12 kV Substation.
  • 18 km of underground high-voltage lines.
  • Concrete tower with assembled segments cast near the site.
  • Up to 150 local people employed at the concrete tower plant, increasing the project's benefit to the community.
  • Medium-voltage power generation to avoid the use of transformers.

Image Gallery

discover other flagship projects

Mt Gellibrand Wind Farm

Winchelsea, Victoria (Australia)

Mt Gellibrand Wind Farm is located 25 kilometres east of Colac and 17km west of Winchelsea in the Colac Otway Shire on Victoria’s Western Plains. The wind farm has been constructed around the southern and western sides of Mt Gellibrand itself. These open and partly elevated plains make the site an ideal location for a wind farm.

Cathedral Rocks Wind Farm

Port Lincoln, South Australia (Australia)

The site covers an area of about 29km², with a coastal exposure of nearly 11 kilometres. The Wind Farm consists of 33 two-megawatt wind turbines – generating enough green electricity to supply 35,000 homes every year.

Move up

YOU'RE JUST ONE STEP AWAY!

Please, confirm your subscription on the email we have sent you and your registration will be completed.

YOU'VE ONLY GOT ONE STEP LEFT!

Please confirm your subscription in the email we just sent you to complete the registration and you will be able to download your ebook.

YOU ARE ALREADY SUBSCRIBED TO THE NEWSLETTER!

If you've missed our content, try checking your junk mailbox and
add us to your address book so you can enjoy them without any problem.

labelSubscribeError

Your email has been unsubscribed. You will not receive more newsletters, unless you subscribe again. Thank you very much