Located in the municipality of Barásoain (Navarra), the farm incorporates five ACCIONA technology turbines of 3 MW each, the highest capacity designed by the company.
Three of the wind turbines are mounted on steel towers and two are mounted on concrete towers, which makes it possible to test the behaviour of both materials in the same location, under different wind conditions.
The steel towers are 92 and 95.5 metres high and the concrete towers are 100 metres high; all turbines have 116-m diameter rotors.
Construction of the facility began in late 2012, and start-up was in February 2013.
Its experimental nature does not mean that the installation will not make a significant contribution of power to the grid. It produces an average of 34 GWh per year, equivalent to the electricity consumption of over 12,000 homes.
Mt Gellibrand Wind Farm is located 25 kilometres east of Colac and 17km west of Winchelsea in the Colac Otway Shire on Victoria’s Western Plains. The wind farm has been constructed around the southern and western sides of Mt Gellibrand itself. These open and partly elevated plains make the site an ideal location for a wind farm.
The site covers an area of about 29km², with a coastal exposure of nearly 11 kilometres. The Wind Farm consists of 33 two-megawatt wind turbines – generating enough green electricity to supply 35,000 homes every year.