- River Miño International Bridge
The bridge has two independent road decks, one for each direction of traffic flow. With a length of 380 m, each platform has a total width of 12.8 m and two 3.5-m lanes, a 2.5-m outer shoulder, a 1-m inner shoulder and two 1.15-m sidewalks where the guardrail and the semi-rigid barrier are located.
ACCIONA Ferrovial Joint Venture (PACIFICO) has been engaged by Health Infrastructure for bulk earthworks and to design and construct an access road to the new hospital at North Macksville.
ACCIONA as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.