This fully-Federally funded project is part of the Department of Transport and Main Roads Queensland targeted improvements were made to the Bruce Highway between Caboolture and Caloundra.
Prior to construction, the Interchange was already used by more than 50,000 vehicles a day. The clearance beneath the existing overpass was a low 4.5 metres which forced heavy road vehicles to detour from the Bruce Highway.
The project built a new, higher overpass over the Highway including pedestrian path and cyclist lane, lengthened and straightened the four on and off-ramps, improved the intersections with local roads as well as installed pedestrian and cycling facilities. The overpass construction was completed in 2015.
ACCIONA Ferrovial Joint Venture (PACIFICO) has been engaged by Health Infrastructure for bulk earthworks and to design and construct an access road to the new hospital at North Macksville.
ACCIONA as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.