- ACCIONA
- Projects
- Construction
- Roads, Bridges and Special Structures
- Nose Hill Interchange
Primary contractor responsible for the construction of the project.
The design was provided by Alberta Transportation, although there were several specific items that needed more in-depth design (bearings, expansion joints, MSE walls, steel diaphragms, etc.). Therefore, our construction team also took care of this part of the design, together with our suppliers and with the support of our engineering company, ACCIONA.
ACCIONA Ferrovial Joint Venture (PACIFICO) has been engaged by Health Infrastructure for bulk earthworks and to design and construct an access road to the new hospital at North Macksville.
ACCIONA as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.
View ACCIONA Social Networks