The foundation, made of piles and abutments, was executed by means of piles with a diameter of 1.50 metres and depths ranging from 17 to 26 metres.
It was designed in such a way that it allows for future expansion to three lanes, and a 0.75-m sidewalk was created next to the 2.50-m hard shoulder, allowing any drivers whose cars have broken down, or any other person, to walk safely along the road should the General Council of Aragón deem it necessary.
ACCIONA Ferrovial Joint Venture (PACIFICO) has been engaged by Health Infrastructure for bulk earthworks and to design and construct an access road to the new hospital at North Macksville.
ACCIONA as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.
View ACCIONA Social Networks