The construction for the Government of the State of Campeche started in July 2009 and lasted 19 months.
The construction has a total length of 837 m. The bridges make up a total of four structures, with lengths of 195 m, 111 m, 167 m and 364 m, respectively.
ACCIONA Ferrovial Joint Venture (PACIFICO) has been engaged by Health Infrastructure for bulk earthworks and to design and construct an access road to the new hospital at North Macksville.
ACCIONA as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.