This website uses proprietary and third-party cookies. By continuing to navigate this website, you are accepting the use that we make of them. If you wish, you may change your settings on your browser.

What are you searching?

Bridge over Clarence River at Harwood

ACCIONA,as part of Acciona Ferrovial Joint Venture (AFJV), has been engaged to design and build the new bridge over the Clarence River at Harwood, located on the Pacific Highway, in New South Wales.

General information

  • Location: Harwood, NSW, Australia
  • Our role: Design and construct
  • Infrastructure: Design and construction of 1.5km single deck bridge
  • Project value: Part of the overall AU$4.36 billion Woolgoolga to Ballina Pacific Highway upgrade
  • Estimated completion date: End 2019

Key Features

Construction of the new bridge involves:

  • Design and construction of a new 1.52 kilometre bridge over the Clarence River, about 30  meters downstream from the existing bridge. The length of the bridge over the Clarence River will span 620 meters, with a vertical clearance above the river of at least 30 metres for marine traffic to pass.
  • The new bridge will be a dual carriageway bridge, with two lanes in each direction.
  • There will be local road works at the northern and southern abutments.
  • AFJV is working with Roads and Maritime Services (RMS) to develop and implement innovative and efficient design solutions which will reduce the overall construction and operations budget.

Benefits

The project is part of the larger AU $4.36 billion Woolgoolga to Ballina Pacific Highway upgrade and is jointly funded by the state and federal governments.

Once complete, the upgrade will improve road safety, reduce travel times and increase transport efficiency.

 

Current Status

The bridge over the Clarence River at Harwood project has celebrated a significant milestone with permanent land and river piling now underway. This project is part of the Woolgoolga to Ballina Pacific Highway upgrade.

The project is gaining momentum as 12 permanent land piles north of the Clarence River have been built. There are now sixteen permanent piles in the Clarence River which were built using two barges. Marine piling is taking place on the northern and southern banks of the Clarence River, moving towards the centre of the river. Pile excavation and concrete installation for both land and marine permanent piles is now underway.

The precast yard is nearly complete with the shed from Pacifico’s project in Macksville being delivered and installed in sections during the coming weeks.

The project team is continuing to work closely with Roads and Maritime Services, its delivery partner Pacific Complete, to deliver the 1.5 kilometres bridge, which is the longest on the 155 kilometre upgrade.

The project team is now fully established at the site compound on the north of the Clarence River and is growing in number as the project progresses.

The Australian and NSW governments are jointly funding the $4.36 billion Woolgoolga to Ballina upgrade. The upgrade is expected to be completed by 2020.

 

Visit the RMS WEBSITE for more information about this project.

Aerial imagery by www.macrosurveyors.com

 

 

Image Gallery

discover other flagship projects

Macksville Hospital Development (MHD) Early Works – Access Road and Bulk Earthworks

ACCIONA Ferrovial Joint Venture (PACIFICO) has been engaged by Health Infrastructure for bulk earthworks and to design and construct an access road to the new hospital at North Macksville.

Toowoomba Second Range Crossing

Toowoomba, QLD (Australia)

ACCIONA as a Design and Construct JV partner of the Nexus Infrastructure consortium, awarded with the contract to design and construct the $1.6 billion Toowoomba Second Range Crossing (TSRC). 

Move up

YOU'RE JUST ONE STEP AWAY!

Please, confirm your subscription on the email we have sent you and your registration will be completed.

YOU'VE ONLY GOT ONE STEP LEFT!

Please confirm your subscription in the email we just sent you to complete the registration and you will be able to download your ebook.

YOU ARE ALREADY SUBSCRIBED TO THE NEWSLETTER!

If you've missed our content, try checking your junk mailbox and
add us to your address book so you can enjoy them without any problem.

labelSubscribeError

Your email has been unsubscribed. You will not receive more newsletters, unless you subscribe again. Thank you very much