22km tunnel for the first underground line in Quito, Ecuador.
The first line in the Ecuadorean capital will be 22km long with three new stations, adding to the two already built by ACCIONA.
The line will also have workshops and the railway installations needed for its correct operation. The contract includes the integration and start-up of systems.
The metro line runs from Quitumbe bus station to the southern suburbs and El Labrador station, north of the old airport site.
Phase I of Quito Metro was also built by ACCIONA and includes El Salvador and La Magdalena stations.
GENERAL INFORMATION
Location: Quito, Ecuador
Contract type: Construction
Infrastructure: 22km tunnel, 13 new stations, and the depots, workshops and railway installations needed for operations
Year of completion: 2019
OBJECTIVE
Boost passenger transport in Quito. The line is the first element of a new public transport system in the Ecuadorean capital.
BENEFIT
The project represents savings of USD 50m a year in fuel costs by improving urban transport, with the resulting reduction of 67,000 metric tons of CO2.
INCLUDES
Integration and start-up of systems.
ACCIONA was the lead partner of the Transcity Joint Venture, for the design, construction, operation and 10 year maintenance of the $1.5 billion Legacy Way project, in Brisbane, Queensland.
ACCIONA is the Principal Design and Construct JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail.