The construction for this tunnel took place between 2004 and 2009. The project consisted of the construction of twin tunnels with a diameter of 8.5 m and a length of 10.67 km. The project was completed in March 2009.
7.67 km was excavated using tunnel boring machines, and the remaining 3 km using conventional methods.
ACCIONA was the lead partner of the Transcity Joint Venture, for the design, construction, operation and 10 year maintenance of the $1.5 billion Legacy Way project, in Brisbane, Queensland.
ACCIONA is the Principal Design and Construct JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail.