ACCIONA participated in the construction of all three sections of the project. From Olmedo to Zamora, there are 32 km of dual track, 7 viaducts, 10 overpasses and 12 underpasses. From Vigo to Das Maceiras, there are 7 km of dual track and two 10.9-km long twin tunnels. From Zamora to Lubian, there are 42 km of dual track, 2 tunnels (1.7 km and 2.4 km) and 2 bridges. These project sections were completed in 2009, 2010 and 2012, respectively.
It is a new 435-km long route, installed with UIC-gauge double electrified track (1.4 mm) and ASFA and ERTMS signalling.
ACCIONA was the lead partner of the Transcity Joint Venture, for the design, construction, operation and 10 year maintenance of the $1.5 billion Legacy Way project, in Brisbane, Queensland.
ACCIONA is the Principal Design and Construct JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail.
View ACCIONA Social Networks