- ACCIONA
- Projects
- Construction
- Railways and Tunnels
- High-Speed Rail: Seville-Cádiz (Bahía Sur subsection)
The new line has two general tracks with a distance between axes of 4.3 m and a platform width of 13.3 m. The project was completed in December 2008.
ACCIONA was the lead partner of the Transcity Joint Venture, for the design, construction, operation and 10 year maintenance of the $1.5 billion Legacy Way project, in Brisbane, Queensland.
ACCIONA is the Principal Design and Construct JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail.
View ACCIONA Social Networks