High-Speed Atlantic Rail Line, Vigo-Das Maceiras section

The project consisted of the construction of twin tunnels, with galleries between them every 250 m. The ends of the tunnels are extended with false tunnels. On the Vigo side, these tunnels meet under the A-9 Highway through a section between cut-off walls, constructed with a "cut-and-cover" method.

The section has two distinct parts. The first is the open subsection between the origin of the project established at k.p. 2/200 from the parking lot defined in the survey report, which meets the junction with Buenos Aires Street, and the entrance of the false tunnels preceding the tunnel, formed by two twin tubes for a single track. The second part consists of this tunnel subsection whose exit is near the end of the section and at the origin of the next section, and which constitutes the main part of this project.

The most significant features of the project include the construction of:

  • Two twin tunnels that are extended at their ends by false tunnels.
  • On the Vigo side, these tunnels meet under the A-9 Highway through a section between cut-off walls, constructed with a "cut-and-cover" method.
  • There will be galleries between both tunnels built every 250 m, excavated using conventional methods.

General Information

Location
Vigo, Spain
Contract type
Construction
Infrastructure
2 x 8.15-km long tunnels with 250 m of emergency galleries
Year of project completion
2010

Image Gallery

discover other flagship projects

Legacy Way Tunnel

Brisbane, QLD (Australia)

ACCIONA was the lead partner of the Transcity Joint Venture, for the design, construction, operation and 10 year maintenance of the $1.5 billion Legacy Way project, in Brisbane, Queensland.

Sydney Light Rail

Sydney, NSW (Australia)

ACCIONA is the Principal Design and Construct JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail. 

Move up

YOU'RE JUST ONE STEP AWAY!

Please, confirm your subscription on the email we have sent you and your registration will be completed.

YOU'VE ONLY GOT ONE STEP LEFT!

Please confirm your subscription in the email we just sent you to complete the registration and you will be able to download your ebook.

YOU ARE ALREADY SUBSCRIBED TO THE NEWSLETTER!

If you've missed our content, try checking your junk mailbox and
add us to your address book so you can enjoy them without any problem.

labelSubscribeError

Your email has been unsubscribed. You will not receive more newsletters, unless you subscribe again. Thank you very much