Bessons Tunnel, Segarra-Garrigues Canal, Section V

Along its full length of 85 km, the canal constitutes the backbone of the works that make up the Segarra-Garrigues System, the aim of which is to transform 75,000 ha in the province of Lleida into irrigable land.

The initial stage of the project includes the construction of the canal over the last 22.27 km, including all of the necessary hydraulic works for the proper control of the canal. In addition, two intakes were designed for two irrigation sectors: 8 and 9. This project does not include a study of the conveyance system necessary for the irrigation reservoirs. In the initial phase of the project, the owner reported the need to include the construction of a new intake in the project plan.

- 13.3 km were built with a trapezoidal cross-section, with a bottom width of 3.00 m and a top width of 12.60 m, and lined with 15-cm thick HM-25 concrete with polypropylene fibre.

- 5.3 km of tunnel construction: the 300-m long Serranía Tunnel was excavated using conventional methods (the New Austrian Method) and the 4,990-m long Bessons Tunnel was excavated with an open shield tunnel boring machine. Both tunnels were lined using a trolley.

- 2 km bottom-poured (executed with a double concrete pipe with metal covering, with an internal diameter of 2,400 mm)

- 1.7 km distributed across 3 aqueducts (1 of them to cross over the AP-2 Highway).

General Information

Location
Lleida, Spain
Contract type
Construction
Infrastructure
13.3 km were constructed as a trapezoidal canal, 3.00 metres wide at the base and 12.60 metres at the crown, a tunnel with a diameter of 4.1 m and a length of 5.3 km, 2 km bottom poured, and 1.7 km distributed across 3 aqueducts
Year of project completion
2012

Image Gallery

discover other flagship projects

Legacy Way Tunnel

Brisbane, QLD (Australia)

ACCIONA was the lead partner of the Transcity Joint Venture, for the design, construction, operation and 10 year maintenance of the $1.5 billion Legacy Way project, in Brisbane, Queensland.

Sydney Light Rail

Sydney, NSW (Australia)

ACCIONA is the Principal Design and Construct JV partner of the ALTRAC consortium, awarded with the contract to design and construct the $2.1 billion Sydney CBD South East Light Rail. 

Move up

YOU'RE JUST ONE STEP AWAY!

Please, confirm your subscription on the email we have sent you and your registration will be completed.

YOU'VE ONLY GOT ONE STEP LEFT!

Please confirm your subscription in the email we just sent you to complete the registration and you will be able to download your ebook.

YOU ARE ALREADY SUBSCRIBED TO THE NEWSLETTER!

If you've missed our content, try checking your junk mailbox and
add us to your address book so you can enjoy them without any problem.

labelSubscribeError

Your email has been unsubscribed. You will not receive more newsletters, unless you subscribe again. Thank you very much