- ACCIONA
- Projects
- Construction
- Railways and Tunnels
- Railway line Sandbukta – Moss – Såstad (SMS 2A)
Design and construction of a 10 km bypass of dual-track railway between Sandbukta and Såstad, of which 5.5 km are underground, crossing the municipality of Moss.
Design and construction by MossIA , a Joint Venture of Impenia Norge AS and ACCIONA. consisting of a 10 km bypass of dual-track railway between Sandbukta and Såstad, of which 5.5 km are underground, crossing the municipality of Moss.
The main works include two tunnels, 2.3 km and 2.7 km respectively, two cut-and-cover tunnel and a new station in central Moss, around 60 km south of Oslo.
The project is part of the Bane NOR Intercity program to develop connections between the country’s main cities and relieve congestion around the capital city of Oslo.
Currently the largest transport infrastructure project in Norway.
View ACCIONA Social Networks